Petitions Archives Print Back
Title Petitioner File Name Date of Receiving
Petition No. 115/2023: Petition for approval of the True-up of FY 2022-23, Annual Performance Review of FY 2023-24, Annual Revenue Requirement for FY 2023-24, & Tariff Proposal for FY 2024-25 of the Electricity Department, Goa goapetition2425 Edit (Size: 5.83MB )
Monday, December 18, 2023
Petition No. 108/2023: Review Petition for reviewing the tariff order dated 01.08.2023 passed by Hon'ble Commission in Petition No. 89/2022. document Edit (Size: 16.23MB )
Friday, October 6, 2023
Petition No. 102/2023:Petition for approval of True-Up for FY 2020-21 & 2021-22 by Electricity Department, Govt. of Goa and Note of Submission with respect to hearing held on Petition No. 77 of 2022 on behalf of Electricity Department, Govt. of Goa. True up Petition Edit (Size: 4.73MB )
Friday, June 23, 2023
Petition No.89/2022 : Petition under Section 61, 62 and 64 of the Electricity Act, 2003 read with all applicable Regulations, under the JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021 for Review of ARR of FY 2022-23 based on revised estimates and Determination of ARR & Tariff for FY 2023-24 for Distribution business of Dadra and Nagar Haveli and Daman and Diu. Tariff Petition DNHDDPDCL for FY 2023-24 Edit (Size: 7.27MB )
Friday, March 10, 2023
Petition No. 99/2023:Petition for approval of True-up of FY 2020-21 and FY 2021-22, APR of FY 2022-23, ARR for FY 2023-24 & Tariff Proposal for FY 2023-24 of the Electricity Wing of Engineering Department, UT Chandigarh. EWEDC Petition for FY 2023-24 Edit (Size: 9.80MB )
Monday, February 6, 2023
Petition No. 96/2022: Tariff petition -true up for 2021-22, APR for FY 2022-23 and tariff determination for FY 2023-24 EDP Petition Edit (Size: 17.43MB )
Monday, December 26, 2022
Petition No. 95/2022: Petition for approval of APR of FY 2022-23, ARR for FY 2023-24 & Tariff Proposal for FY 2023-24, filed by ED, Goa GOA TARIFF PETITION 23-24 Edit (Size: 17.03MB )
Thursday, December 8, 2022
Petition No. 94/2022: Petition for approval of true-up of FY 2021-22, Review of FY 2022-23 and ARR and Determination of Transmission Tariff for FY 2023-24 for Electricity Department, Daman & Diu under section 61, 62 and 64 of the Electrciity Act, 2003 DD Petition FY 2023-24 Edit (Size: 14.38MB )
Thursday, December 8, 2022
Petition No. 92/2022:Approval of ARR petition and tariff proposal of ED, Transmission division of Dadra and Nagar Haveli for FY 2023-24 under section 61, 62 and 64 of the EA, 2003 DNH Transmission petition Edit (Size: 14.90MB )
Wednesday, December 7, 2022
Petition No.93/2022: Petition for Approval of ARR for the FY 2023-24 for DNH and DD Power Corporation Limited under section 61,62 and 64 of the EA, 2003 and Tariff Proposal for FY 2023-24 DNH Power Distribution Company Ltd ca Edit (Size: 5.14MB )
Wednesday, December 7, 2022
Petition No. 91/2022:Petition for APR for FY 2022-23 and ARR & Tariff Proposal for FY 2023-24 Lakshadwee petition 23-24 Edit (Size: 12.47MB )
Wednesday, November 30, 2022
Petition No.88/2022: PPCL-Petition for PPCL Gas Power Station (32.5MW) for the control period 2023-25 along with APR for the FY 2022-23, REVISION OF TARIFF FOR THE PERIOD 01.04.2020 TO 31.03.2021 after the provision truing up exercise and revision of tariff for the period 01.04.2021 to 31.03.2022 after the provisional truing up exercise. PPCL1 Edit (Size: 14.78MB )
Wednesday, November 23, 2022
Petition No. 85 of 2022: Petition for approval of True-up for FY 2017-18, FY 2018-19 and FY 2019-20 by Electricity Department, Govt. of Goa 85petition Edit (Size: 7.91MB )
Monday, October 10, 2022
Petition No. 81/2022: Petition for Approval of APR for the FY 2021-22 & ARR & Tariff Proposal for the FY 2022-23, FY 2023-24 & FY 2024-25 81MYT Edit (Size: 11.87MB )
Monday, May 2, 2022
Petition No. 78/2022: Business Plan for 3-year MYT Control Period from FY 2022-23 to FY 2024-25 78BP Edit (Size: 10.59MB )
Monday, May 2, 2022
Petition No. 79/2022: Filing Petition for the Business Plan for the control period of from FY 2022- 23 to FY 2024-25 for the Electricity Wing of Engineering Department, Chandigarh Administration as per Regulation 8 and 17 of JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021 79 Edit (Size: 3.09MB )
Tuesday, April 19, 2022
Petition No. 80/2022: Filing Petition for True-Up of FY 2020-21, Annual Performance Review of FY 2021-22 and Aggregate Revenue Requirement (ARR) for FY 2022-23 to FY 2024-25 and Tariff Proposal for FY 2022-23 of Electricity Wing of Engineering Department, Chandigarh. 80 Edit (Size: 5.43MB )
Tuesday, April 19, 2022
Petition No.75/2022: Petition for true-up for FY 2017-18 and FY 2018-19, APR for FY 2021-22 and MYT Petition for thee control period FY 2022-23 to FY 2024-25 & Tariff Proposal for FY 2022-23 MYT petition Edit (Size: 4.92MB )
Wednesday, January 12, 2022
Petition No. 74/2022:Petition for approval of Business plan for 3 year MYT Control Period FY 2022-23 to FY 2024-25 Business plan petition Edit (Size: 1.89MB )
Wednesday, January 12, 2022
Petition no. 69/2021: Petition for approval of the Business Plan for control period from FY 2022-23 to FY 2024-25 for the Electricity Department of Puducherry as per Regulation 8 and 17 of JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021. EDP BP Edit (Size: 18.83MB )
Wednesday, January 5, 2022
Petition No. 70/2021: Petition for approval of True-up for FY 2020-21, Annual Performance Review of FY 2021-22, Aggregate Revenue Requirement (ARR) for MYT Control Period from FY 2022-23 to FY 2024-25 and Determination of Retail Tariff for FY 2022-23 of Electricity Department, Puducherry u/s 61, 62 and 64 of the Electricity Act, 2003 and JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2018 & JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations 2021. EDPMYT Edit (Size: 16.31MB )
Wednesday, January 5, 2022
Petition No. 60/2021:3. MYT Petition for determination and approval of tariff of PPCL Gas Power Station (32.5 MW) for the period 2022-23 to 2024-25 along with Annual Performance Review for the FY 2021-22, Revision of Tariff for the period 01.04.2019 to 31.03.2020 after the truing up exercise and Revision of Tariff for the period 01.04.2020 to 31.03.2021 after the Provisional truing up exercise under section 61, 62 & 64 of the Electricity Act, 2003 ppcl Edit (Size: 13.07MB )
Wednesday, January 5, 2022
Petition No. 64/2021: True Up Petition for the FY 2017-18, FY 2018-19, FY 2019-20 & FY 2020- 21 of Electricity Department of Andaman & Nicobar Administration u/s 61, 62 and 64 of the Electricity Act, 2003 True-up Petition Edit (Size: 7.82MB )
Thursday, December 30, 2021
Petition No. 68/2021: Petition for approval of True-up for FY 2020-21, Annual Performance Review (APR) of FY 2021-22 and Aggregate Revenue Requirement (ARR) for MYT Control period FY 2022-23 to FY 2024-25 for DNH Power Distribution Corporation Limited(DNHPDCL) under Section 61,62 and 64 of the Electricity Act, 2003 and the JERC (Generation, Transmission and Distribution Multi Year Tariff Regulations, 2018 and JERC (Generation, Transmission and Distribution Multi Year Tariff Regulations, 2021. 68DNHPDCLMYT Edit (Size: 7.30MB )
Tuesday, December 28, 2021
Petition No. 67/2021: Petition for approval of Business Plan for the MYT Control Period FY 2022-2023 to FY 2024-25 for DNH Power Distribution Corporation Limited (DNHPDCL) under Section 61,62 and 64 of the Electricity Act, 2003 and Regulation 8 and 17 of JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021. 67DNHPDCLBP Edit (Size: 2.69MB )
Friday, December 24, 2021
Petition No. 65/2021: Petition for approval of Business Plan for control period from FY 2022-23 to FY 2024-25 for the Electricity Department of Daman & Diu, UT of Dadra and Nagar Haveli and Daman & Diu as per Regulation 8 and 17 of JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021. 65DDBP Edit (Size: 10.55MB )
Wednesday, December 22, 2021
Petition No. 66/2021: Petition for approval of True-up for FY 2020-21, Annual Performance Review (APR) of FY 2021-22 and Aggregate Revenue Requirement (ARR) for MYT Control period FY 2022-23 to FY 2024-25 for Electricity Department, Daman & Diu, UT of Dadra and Nagar Haveli and Daman & Diu under Section 61,62 and 64 of the Electricity Act, 2003 and the JERC (Generation, Transmission and Distribution Multi Year Tariff Regulations, 2018 and JERC (Generation, Transmission and Distribution Multi Year Tariff Regulations, 2021 66DDMYT Edit (Size: 16.44MB )
Wednesday, December 22, 2021
Petition No.63/2021:Petition for approval of Annual Performance Review of FY 2021-22 and Aggregate Revenue Requirement (ARR) for MYT Control period FY 2022-23 to FY 2024-25 & Tariff Proposal for FY 2022-23 of Electricity Department, Goa u/s 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 GOA MYT TARIFF PETITION Edit (Size: 3.67MB )
Tuesday, December 14, 2021
Petition No. 71/2021: Petition for approval of the Business Plan for the MYT Control Period FY 2022-2025 for Electricity Department, Transmission Division, Dadra & Nagar Haveli, Union Territory of Dadra and Nagar Haveli and Daman and Diu under Section 61,62 and 64 of the Electricity Act, 2003 and Regulation 8 of JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021. 71DNHTRBP Edit (Size: 13.08MB )
Tuesday, December 7, 2021
Petition No. 61/2021: Petition for approval of True-up for FY 2020-21, Annual Performance Review (APR) of FY 2021-22 and Aggregate Revenue Requirement (ARR for Multi Year Tariff Determination for the Control Period FY 2022-23 to FY 2024-25 for Electricity Department, Transmission Division, Dadra & Nagar Haveli, Union Territory of Dadra and Nagar Haveli and Daman & Diu under Section 61,62 and 64 of the Electricity Act, 2003 and the JERC (Generation, Transmission and Distribution Multi Year Tariff Regulations, 2018 and JERC (Generation, Transmission and Distribution Multi Year Tariff Regulations, 2021 61DNHTRMYT Edit (Size: 8.28MB )
Tuesday, December 7, 2021
Petition No. 62/2021 :Petition for approval of the Business Plan for control period from FY 2022-23 to FY 2024-25 as per Regulation 8 and Regulation 17 of JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2021 download (18) Edit (Size: 10.87MB )
Friday, November 12, 2021
Petition No. 45/2021: Petition under Section 9, 42, 86 & other applicable provisions of the Electricity Act, 2003 read with the provisions of the JERC (Connectivity and Open Access in the Intra-State Transmission and Distribution) Regulations, 2017. amplus energy Edit (Size: 3.13MB )
Tuesday, April 27, 2021
Petition No. 44/2021 :Petition for approval of Review of FY 2020-21, Aggregate Revenue Requirement and Tariff Proposal for FY 2021- 22 under section 61, 62 & 64 of the Electricity Act, 2003 Petition 21-22 andaman Edit (Size: 4.07MB )
Friday, April 23, 2021
Petition No 41/2020: Petition for Annual Performance Review for FY 2020-21 and ARR & Tariff Proposal for FY 2021-22 tariff petition lkp Edit (Size: 14.00MB )
Tuesday, February 16, 2021
Petition No. 40/2020:Petition for approval of Truing Up for FY 2019-20, Annual Performance Review of FY 2020-21, Aggregate Revenue Requirement (ARR) and Tariff Proposal for FY 2021- 22 under section 61, 62 & 64 of the Electricity Act, 2003 and Regulation 9 and 74 of the JERC (Generation, Transmission and Distribution Multi Year Tariff) Regulations, 2018, is filed by the Electricity Wing of Engineering Department UT, Chandigarh (EWEDC). EWEDC Tariff Petition FY 21-22 Edit (Size: 1.85MB )
Wednesday, January 20, 2021
Petition No. 34/2020: Petition for approval of true-up of FY 2019-20 and Revision of ARR for FY 2020-21 & FY 2021-22 and Determination of Tariff for FY 2021-22. EDP Tariff Petition for FY 2021-22 Edit (Size: 1.11MB )
Wednesday, December 16, 2020
Petition No.36/2020: Petition for approval of Truing Up for FY 2019-20, Review of FY 2020-21, ARR and Tariff Proposal for FY 2021-22 under Section 61, 62 and 64 of the Electricity Act, 2003 tariff petition dd 2122 Edit (Size: 19.32MB )
Wednesday, December 9, 2020
Petition No. 37/2020: Petition for Approval of Truing Up for FY 2019-20, Review of FY 2020-21, ARR and Tariff Proposal for FY 2021-22 under Section 61, 62 and 64 of the Electricity Act, 2003 DNHPDCL Tariff petition 2122 Edit (Size: 12.16MB )
Tuesday, December 8, 2020
Petition No. 38/2020: Petition for approval of Truing Up for FY 2019-20, Review of FY 2020-21, ARR and Tariff Proposal for FY 2021-22 under section 61, 62 and 64 of the Electricity Act, 2003. petition transmission 2122 Edit (Size: 3.87MB )
Tuesday, December 8, 2020
Petition No. 39/2020: Petition for Approval of Truing Up for FY 2016-17, Review of FY 2020-21, ARR and Tariff Proposal for FY 2021-22 under section 61, 62 and 64 of the Electrciity Act, 2003 ED-Goa Petition Edit (Size: 1.84MB )
Tuesday, December 1, 2020
Petition No. 35/2020:Petition for determination and approval of tariff of PPCL Gas Power Station (32.5MW) for the period 2021-22 along with APR for FY 2020-21, Revision of Tariff for the Period 01.04.2018 to 31.03.2019 after the provisional truing up exercise and revision of tariff for the period 01.04.2019 to 31.03.2020 after the provisional truing up exercise. ppcl Tariff petition 2021-22 Edit (Size: 19.25MB )
Wednesday, November 25, 2020
Petition No. 23/2019: Petition for Approval of Truing Up for FY 2016-17, Review of FY 2019-20, ARR and Tariff Proposal for FY 2020-21 under Section 61, 62 and 64 of the Electricity Act, 2003 Tariff Petition77 Edit (Size: 5.31MB )
Thursday, February 20, 2020
Petition No. 23/2019: Petition for Approval of Truing Up for FY 2016-17, Review of FY 2019-20, ARR and Tariff Proposal for FY 2020-21 under Section 61, 62 and 64 of the Electricity Act, 2003 Monday, February 17, 2020
Petition No. 24/2019: Petition for approval of truing up for FY 2015-16 and FY 2016-17, review of FY 2019-20, ARR & Tariff Proposal for FY 2020-21 under section 61, 62 and 64 of the Electricity Act, 2003 filed by Electricity Department, UT of Lakshadweep LED Tariff Petition 2020-21 Edit (Size: 1.27MB )
Tuesday, December 31, 2019
Petition No. 21/2019: Petition for approval of Truing up for FY 2015-16, Review of FY 2019-20, ARR and Tariff Proposal for FY 2020-21 under section 61, 62 and 64 of the Electricity Act, 2003 ED Goa Petition 2021 Edit (Size: 2.05MB )
Wednesday, December 11, 2019
Petition No. 20/2019: Electricity Department, Puducherry filed a Petition for True-up for FY 2017-18 and FY 2018-19, Annual Performance Review for FY 2019-20 and ARR and Tariff Determination for FY 2020-21. ARR FY19-22-Puducherry Edit (Size: 77.98MB )
Monday, December 9, 2019
Petition No. 22/2019: Petition for Approval of True-up of FY 2018-19, Review of FY 2019-20 and ARR and Tariff Proposal for FY 2020-21 for UT of DAMAN & Diu ddpetition Edit (Size: 3.75MB )
Monday, December 9, 2019
Petition No. 19/2019: Petition for approval of Truing Up for FY 2018-19, Review of FY 2019-20, Aggregate Revenue Requirement and Tariff Proposal for FY 2020-21 under section 61, 62 & 64 of the Electricity Act, 2003 DNHPDCL Tariff petition FY 2020-21 (Size: 45.73MB )
Friday, December 6, 2019
Petition No. 18/2019: Petition for approval of Truing Up for FY 2018-19, Review of FY 2019-20, Aggregate Revenue Requirement and Tariff Proposal for FY 2020-21 under section 61, 62 & 64 of the Electricity Act, 2003 Tariff Petition DNH (T) FY 2020-21 (Size: 4.22MB )
Wednesday, December 4, 2019
Petition No.17/2019: Approval of Truing up for FY 2018-19, Review of FY 2019-20, Aggregate Revenue Requirement and Tariff Proposal for FY 2020-21 under Section 61, 62 and 64 of the Electrcitiy Act, 2003 and Regulation 9 and 74 of the JERC (Generatioin , Transmission and Distribution Multi Year Tariff) Regulations, 2018, Filed by Electrcity Wing of Engineering Department, UT Chandigarh. EWEDC TP - 2020-21 (1) Edit (Size: 1.33MB )
Wednesday, December 4, 2019
Petition No. 16/2019 : Petition for Determination and approval of tariff of PPCL Gas Power Station (32.5MW) for the period FY 2020-21 along with revision of tariff for the period 01.04.2017 to 31.03.2018 after TGE Truing up expercisie and revision of tariff for the period 01.04.2018 to 31.03.2019 after the provisional truing up exercise. Tariff Petition 2020-21 Edit (Size: 40.14MB )
Wednesday, November 27, 2019
Petition 267/2018 :Petition for True-up of FY 2017-18, Annual Performance Review of FY 2018-19 and Multi Year Aggregate Revenue Requirement (ARR) for the Control Period of FY 2019-20 to FY 2021-22 & Tariff Proposal of FY 2019-20 of Electricity Wing of Engineering Department, Chandigarh chandigarh1920 Edit (Size: 1.89MB )
Wednesday, December 12, 2018
Petition No. 268/2018: Provisional True-up for FY 2017-18, Review for FY 2018-19 and ARR & MYT Petition for FY 2019-20 to FY 2021-22 and Tariff Determination for FY 2019-20- Reg edp1920 Edit (Size: 5.67MB )
Wednesday, December 12, 2018
Petition No.266/2018 :Petition for approval of true-up for FY 2014-15 APR of FY 2018-19, Tariff Determination for FY 2019-20 and Determination of ARR for MYT Control Period for FY 2019-20 to FY 2021-22 goa1920 Edit (Size: 1.74MB )
Wednesday, December 12, 2018
Petition No.264/2018 for approval of Business Plan for the Control Period for FY MYT control period from FY 2019-20 to FY 2021-22 of Electricity Department, ANDAMAN & NICOBAR ISLANDS bpand Edit (Size: 2.25MB )
Thursday, November 29, 2018
Petition No.263/2018 for approval of Business Plan for the Control Period for FY MYT control period from FY 2019-20 to FY 2021-22 of Electricity Department, LAKSHADWEEP BPLKP Edit (Size: 3.19MB )
Thursday, November 29, 2018
Petition No.265/2018 for approval of Business Plan for the Control Period for FY MYT control period from FY 2019-20 to FY 2021-22 of Electricity Department, Goa Business Plan_final ED Goa Edit (Size: 2.63MB )
AdditionalSubmission Edit (Size: 0.73MB )
Annexure1-MonthwiseSales (Size: 0.03MB )
Annexure2-RevisedBPnumber (Size: 0.05MB )
Friday, October 5, 2018
Petition No. 261/2018: Approval of Business Plan for the Control Period for FY 2019-20 to FY 2021-22 of Electricity Department, Puducherry Business Plan edp (Size: 3.03MB )
Friday, September 14, 2018
Petition No. 260/2018 Petition for approval Business Plan for the Control Period for FY 2019-20 to FY 2021-22 of Electricity Department, Transmission Division, DNH BPTRANMISSION Edit (Size: 2.35MB )
Monday, September 10, 2018
Petition No. 258/2018 Petition for approval of Business Plan for the Multi Year Tariff Control Period from FY 2019-20 to 2021-22 under Section 61,62 and 64 of the Electricity Act, 2003 Business plan for MYT 2019-20 to 2021-22 DNH Edit (Size: 3.13MB )
Tuesday, September 4, 2018
Petition no.259/2018 Petition for approval of Business Plan for the MYT Control Period from FY 2019-20 to 2021-22 under Section 61,62 and 64 of the Electricity Act, 2003 filed by ED- Daman & Diu Busniness plan-100 dd Edit (Size: 5.45MB )
Tuesday, September 4, 2018
Petition No. 254/2018 : Petition for True-up for the FY 2016-17, Annual Performance Review of the FY 2017-18 (APR), Aggregate Revenue Requirement (ARR) & Tariff Proposal for the FY 2018-19 under Section 45,46,61,62 & 64 of the Electricity Act, 2003. CHD 2018-19 Edit (Size: 4.01MB )
Friday, January 19, 2018
Petition no. 249/2017 : Electricity Department of Goa has filed a Petition for approval of True-up of FY 2013-14, APR for FY 2016-17 & FY 2017-18 and Tariff Determination proposal for FY 2018-19 under Section 45, 46, 61, 62, 64 and 86 of the Electricity Act, 2003 EDGOAPETITION1819 Edit (Size: 4.27MB )
Wednesday, January 3, 2018
Petition No. 250/2017 :Approval of ARR Petition and Tariff Proposal of Electricity Department (Transmission Division) UT of DNH for FY 2018-19 under Section 61, 62 and 64 of Electricity Act, 2003 ARRTrans2018-19 Edit (Size: 3.39MB )
Friday, December 22, 2017
Petition No. 251/2017: Petition for approval for True-up for FY 2016-17, Review of FY 2017-18 and ARR and Tariff Revision Proposal for FY 2018-19. ARR Daman1819 Edit (Size: 15.70MB )
Friday, December 22, 2017
Petition No.248/2017 : Petition for True-up for FY 2014-15, APR for the FY 2017-18 and Tariff Proposal for FY 2018-19. andaman petition1819 Edit (Size: 1.13MB )
Friday, December 22, 2017
Petition No. 247/2017:Petition for Approval for ARR and Tariff Proposal for the FY 2018-19 for DNHPDCL under Section 61, 62 and 64 of the Electricity Act, 2003 DNHPDCL1819 Edit (Size: 7.45MB )
Thursday, December 21, 2017
Petition No. 245/2017: Petition for approval of True-up Petition for FY 2016-17, Annual Performance Review for FY 2017-18 and Aggregate Revenue Requirement (ARR) with Tariff Proposal for MYT Control Period FY 2018-19 for Electricity Department, Puducherry PED_Tariff Petition FY 2018-19- Final Edit (Size: 6.34MB )
Thursday, December 7, 2017
Petition No. 246/ 2017:Puducherry Power Corporation Ltd (PPCL) Gas Power Station (32.5 MW) has filed a Petition for determination and approval of tariff for the period of 2018-19 and revision of Tariff for the period 01.04.2015 to 31.03.2016 after the truing up exercise PPCL TARIFF PETITION 18-19 Edit (Size: 7.75MB )
Thursday, December 7, 2017
Petition No. 240/2017 : Petition for approval of True-up for FY 2016-17 for DNH PDCL under Section 61,62 and 64 of the Electricity Act, 2003 True-up Petition DNHPDCL Edit (Size: 8.08MB )
Wednesday, September 20, 2017
PETITION NO. 228/2017 : APPROVAL OF TRUE-UP FOR FY 2011-12 AND FY 2012-13, ANNUAL PERFORMANCE REVIEW OF FY 2015-16 & FY 2016-17 AND TARIFF DETERMINATION FOR FY 2017-18 FILED BY ED, GOA edgoa1718 Edit (Size: 3.39MB )
Monday, March 27, 2017
Petition No. 229/2017 for True-up of FY 2015-16, Annual Performance Review of FY 2016-17 and Aggregate Revenue Requirement (ARR) & Tariff Proposal for FY 2017-18 of Chandigarh Electricity Department. CED Tariff Petition 1718 Edit (Size: 1.58MB )
Thursday, January 19, 2017
Petition No. 222/2017 :Petition for Approval of True up for FY 2015-16, Review of FY 2016-17 and ARR and Tariff Revision Proposal for FY 2017-18 for UT of Daman & Diu under Section 61, 62 and 64 of the Electricity Act, 2003 Tariff Petition DD 1718 Edit (Size: 23.73MB )
Monday, January 2, 2017
Petition No. 226/2017 : Petition for Approval of ARR and Tariff Proposal for FY 2017-18 for Distribution DNH Power Distribution Corporation Ltd under Section 61, 62 and 64 of the Electricity Act, 2003. Tariff Petition DISTRIBUTION 1718 Edit (Size: 27.86MB )
Monday, January 2, 2017
Petition No. 223/2017 :Approval of ARR Petition and Tariff Proposal of ED, (Transmission Division) UT of DNH for FY 2017-18 under Section 61, 62 and 64 of the EA, 2003 Tariff Petition DNH (Transmission) 1718 Edit (Size: 9.48MB )
Monday, January 2, 2017
Petition No. 224/2014 :EDP- Govt. of Puducherry True-up Petition for FY 2014-15, FY 2015-16 Review FY 2016-17 and ARR for Control Period from FY 2014-18- Reg Tariff Petition EDP 1718 Edit (Size: 4.37MB )
Monday, January 2, 2017
Petition No. 227/2017 :True-up of FY 2012-13, FY 2013-14 & Provisional True-up FY 2014-15, Annual Performance Review for the FY 2016-17 & Tariff Proposal for the FY 2017-18. A&N Tariff Petition 2017-18 Edit (Size: 14.21MB )
Monday, January 2, 2017
Petition No.221/2017 :True-up for FY 2012-13, Provisional True-up for FY 2013-14 & FY 2014-15 Annual Performance Review of FY 2016-17 Determination of Tariff for FY 2017-18. LED1718 Edit (Size: 23.15MB )
Thursday, December 22, 2016
Petition No. 213/2016 : Determination of tariff for Procurement of Power by Distribution Company/Licensees from Biomass based Power Generating Company in the UT of A&N Islands using the Gasification route (Otto Cycle). 1.Mithakhari Industrial Area, Port Blair, Sourth Andaman District. 213UPLOAD Edit (Size: 1.43MB )
Thursday, September 1, 2016
Petition No. 214/2016 :Determination of tariff for Procurement of Power by Distribution Company/Licensees from Biomass based Power Generating Company in the UT of A&N Islands using the Gasification route (Otto Cycle). 1.Campbell Bay, Great Nicobar Island 214UPLOAD Edit (Size: 1.43MB )
Thursday, September 1, 2016
Petition No. 215/2016 : Determination of tariff for Procurement of Power by Distribution Company/Licensees from Biomass based Power Generating Company in the UT of A&N Islands using the Gasification route (Otto Cycle). 1. Hutbay, Little Andaman Taluk, Dist. South Andaman. 215UPLOAD Edit (Size: 2.64MB )
Thursday, September 1, 2016
Petition No. 216/2016 :Petition in respect of load forecasting study alongwith preparation of action plan for short term (2-5 years), medium term 7- 10 years and long term period 15-25 years at ED, Chandigarh 2016 Edit (Size: 2.68MB )
Thursday, September 1, 2016
Petition No. 212/2016, Petition for determination of project Specific tariff for sale of power to ED of A&N in 1.125MW Renewable wave Energy project 212B Edit (Size: 5.68MB )
212A Edit (Size: 0.25MB )
Friday, August 12, 2016
Petition No. 209/2016Review Petition in respect of Tariff Order FY 2016-17 dated 28th April, 2016 issued by Hon’ble JERC for the UT Chandigarh chandigarhreviewpetition Edit (Size: 11.30MB )
Thursday, July 14, 2016
Petition No. 208/2016, 1MW GRID CONNECTED ROOFTOP SOLAR PV PROJECT IN A&N " TARIFF PETITION" 1MWSOLAR Edit (Size: 10.31MB )
Thursday, July 14, 2016
Petition No. 201/2016: 1. Petition for seeking relief from the restriction on grid penetration upto 30% of the Distribution Transformer Capacity (DTC) for the projects commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and also to allow the grid penetration up to at least 50% of DTC for future projects. 2. To allow the net metering of the Solar Power plants without converting its output on to 11 KV side for the projects already commissioned before the Solar Power-Grid Connected Ground Mounted and Solar Rooftop and Metering Regulations, 2015 came to the existence and in cases where the captive consumption is more than the 3-4 times of the solar power generation then in such cases connection of solar power plant on 11 KV side may be dispensed with. And Electricity Department Chandigarh 201 Edit (Size: 0.18MB )
Friday, April 1, 2016
Petition No. 200/2016: Petition for approval of Draft Solar Net / Gross Metering power Purchase Agreement (PPA). And Electricity Department Chandigarh chd30316 Edit (Size: 1.25MB )
Tuesday, March 22, 2016
Petition No. 198/2016: PETITION FOR TRUE-UP OF FY 2013-14 & FY 2014-15, ANNUAL PERFORMANCE REVIEW OF FY 2015-16 AND AGGREGATE REVENUE REQUIREMENT (ARR) FOR MYT CONTROL PERIOD FROM FY 2016-17 TO FY 2018-19 & TARIFF PROPOSAL FOR FY 2016-17 of CHANDIGARH ELECTRICITY DEPARTMENT And Electricity Department Chandigarh MYTCHD16-17 Edit (Size: 1.20MB )
Monday, February 29, 2016
Petition No. 197/2016: ANNUAL PERFORMANCE REVIEW OF FY 2015-16 AND AGGREGATE REVENUE REQUIREMENT (ARR) WITH TARIFF PROPOSAL FOR MYT CONTROL PERIOD FROM FY 2016-17 TO FY 2018-19 OF ELECTRICITY DEPARTMENT, GOVERNMENT OF GOA And Electricity Department Goa mytgoa16-17a Edit (Size: 3.05MB )
Thursday, February 18, 2016
Petition No. 196/2016: Petition for Multi year tariff for 3 year Control period from FY 2016-17 to 2018-19 And Electricity Department Andaman & Nicobar Admn. n2016-17a_1638 Edit (Size: 3.43MB )
Tuesday, February 9, 2016
Petition No. 195/2016: Filing of Aggregate Revenue Requirement (ARR) for the FY 2016-17 for Electricity Department Transmission Division, UT of Dadra and Nagar Haveli under Section 61,62, and 64 of the Electricity Act, 2003 And Electricity Department Dadra & Nagar Haveli : Petitioner DNHTRANS16-17 Edit (Size: 0.26MB )
Monday, January 25, 2016
Petition No. 194/2016: Petition for approval of Business Plan and Multi Year Tariff Determination for the MYT Control Period FY 2016-17 to FY 2018-19. And Electricity Department Lakshadweep : Petitioner LEDMYT Edit (Size: 0.70MB )
Tuesday, January 19, 2016
Petition No. 192/2016: True up for FY 2014-15, ARR for Multi Year Tariff Determination for Control Period FY 2016-17 to FY 2018-19 and Tariff Revision Proposal for FY 2016-17. And Electricity Department Daman & Diu .. Petitioner MYTDD1617 Edit (Size: 0.69MB )
Tuesday, January 19, 2016
Petition No. 191/2016:Petition for determination and approval of tariff of PPCL Gas Power Station (32.5 MW) for the period 2016-17 And in the matter And Puducherry Power Corp. Ltd.... Petitioner ppclmyt1617a Edit (Size: 3.33MB )
Thursday, January 7, 2016
Petition No. 190 /2016: Petition for approval of True up Petition of 2013-14, provisional true up Petition of 2014-15, Annual Performance Review of 2015-16 and Aggregate Revenue Requirement (ARR) with Tariff Proposal for MYT Control period from FY 2016-17 to 2018-19 And Electricity Department, Puducherry.... Petitioner mytpudu1617 Edit (Size: 2.60MB )
Thursday, January 7, 2016
Petition No. 186 /2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 Ltd under the JERC( Multi Year Distribution Tariff) Regulations, 2014. BPGOA15a.pdf Edit (Size: 2.18MB )
Tuesday, October 6, 2015
Petition No. 186 /2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 Ltd under the JERC( Multi Year Distribution Tariff) Regulations, 2014. And Electricity Department, Goa .... Petitioner BPGOA15a Edit (Size: 2.18MB )
Tuesday, October 6, 2015
Petition No. 183/2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 Ltd under the JERC ( Multi Year Distribution Tariff) Regulations, 2014 BPCHD16-19 Edit (Size: 1.36MB )
Friday, September 18, 2015
Petition No. 185 /2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 Ltd under the JERC( Multi Year Distribution Tariff) Regulations, 2014. And Electricity Department, Andaman & Nicobar Admn. .... Petitioner ANBP16-17_1421 Edit (Size: 1.47MB )
Monday, September 14, 2015
Petition No. 182/2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 for DNH Power Distribution Corp. Ltd under the JERC ( Multi Year Distribution Tariff) Regulations, 2014. BPFY2016-19 Edit (Size: 0.54MB )
Tuesday, September 8, 2015
Petition No. 180/2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 for the Electricity Department of Daman & Diu under the JERC ( Multi Year Distribution Tariff) Regulations, 2014. Business Plan for MYT Control Period Edit (Size: 0.70MB )
Friday, August 28, 2015
Petition No. 179/2015: Petition for approval of Tariff and Agreement for supply of surplus power from biomass based captive power plant of Merck Limited to Electricity Department, Government of Goa, under Section 62 (1) (a) and 86 (1) (a), (b) & (e) of the Electricity Act, 2003 BEFORE THE JOINT ELECTRICITY REGULATORY COMMISSION Edit (Size: 3.08MB )
Friday, August 28, 2015
Petition No. 181/2015: Petition for approval of Business Plan for the MYT Control Period FY 2016-17 to FY 2018-19 under the JERC ( Multi Year Distribution Tariff) Regulations, 2014. And Electricity Department, Puducherry .... Petitioner BPPUDU16-19 Edit (Size: 2.75MB )
Wednesday, August 5, 2015
Petition No. 161/ 2015: Petition for approval of Multi Year Tariff for the Control Period FY 2015-16 to FY 2017-18 of Electricity Department, Govt of Goa MYTGOA Edit (Size: 3.57MB )
Tuesday, January 20, 2015
Petition No. 157/ 2014: Petition for approval of Multi Year Tariff for the Control Period FY 2015-16 to FY 2017-18 of Electricity Department, Govt of Puducherry MYTEDP Edit (Size: 3.41MB )
Friday, January 2, 2015
Petition No. 155/ 2014 for approval of Multi Year Tariff and Revenue Requirement for the control period FY 2015-16 to 2017-18 under Section 61, 62 and 64 of the Electricity Act, 2003. ARRANI15-16 Edit (Size: 0.89MB )
Monday, December 15, 2014
Petition No. 153/ 2014 for Business Plan and ARR for the MYT Control Period FY 2015-16 to 2017-18 BPDDnew Edit (Size: 1.83MB )
Tuesday, December 2, 2014
Petition No. 151/2014 : Truing up for FY 2013-14, Review of FY 2014-15, ARR for Multi Year Tariff Determination for Control Period FY 2015 -16 to FY 2017-18 And Tariff Revision Proposal for FY 2015-16. MYTDNHPDCL Edit (Size: 1.45MB )
Tuesday, December 2, 2014
Petition No. 150/2014 : Petition for approval of Annual Revenue Requirement (ARR) and Tariff Proposal for FY 2015-16 for Electricity Department, Transmission Division under Section 61,62 and 64 of Electricity Act, 2003. trans Edit (Size: 1.95MB )
Tuesday, December 2, 2014
Petition No. 148/2014 : Truing up for FY 2013-14, Review of FY 2014-15, ARR for Multi Year Tariff Determination for Control Period FY 2015 -16 to FY 2017-18 And Tariff Revision Proposal for FY 2015-16. MYTDD Edit (Size: 1.10MB )
Tuesday, December 2, 2014
Petition No. 152/ 2014 for Business Plan and ARR for the MYT Control Period FY 2015-16 to 2017-18 BPAN_1002 Edit (Size: 2.31MB )
Monday, November 17, 2014
Petition No. /2014 : APPLICATION ON BEHALF OF OBJECTOR FOR REVIEW OF ORDERS DATED 24.06.2014 PASSED BY HON’BLE JOINT ELECTRICITY REGULATORY COMMISSION. revmanpoweraug14 Edit (Size: 0.04MB )
Tuesday, August 19, 2014
Petition No. 133/2014 : REVIEW PETITION UNDER CLAUSE 74 OF THE JERC CONDUCT OF BUSINESS REGULATIONS, 2009 READ WITH SECTION 94 (f) of the ELECTRICITY ACT 2003 FOR REVIEWING THE TARIFF ORDER DATED 11-4-2014, PASSED BY THIS HON’BLE COMMISSION, IN PETITION NO 110 OF 2013, TITLED AS CHANDIGARH RENEWAL ENERGY SCIENCE & TECHNOLOGY PROMOTION SOCIETY VS. ELECTRICITY DEPARTMENT, UT, CHANDIGARH .And Chandigarh Renewal Energy Science & Technology Promotion Society, Ist Floor, Paryavaran Bhawan, Sector 19, Chandigarh ( Referred herein after as CREST in the petition) Through its Chief Executive Officer Sh. Santosh Kuma revcrest Edit (Size: 0.07MB )
Thursday, May 22, 2014
Petition No. 129/2014 : Petition in respect of detailed study on manpower requirement at Chandigarh Electricity Department manpower Edit (Size: 1.29MB )
Monday, February 17, 2014
Petition No. 128/2014 : Petition for seeking approval for implementation of DSM based Efficient Lighting Program (DELP) in UT of Puducherry under Demand Side Management Progrmame. delp2 Edit (Size: 0.37MB )
Friday, February 14, 2014
Petition No. 130/2014 : Petition for determination of tariff for supply of surplus power from co-generation power plant of Goa Sponge and Power Limited to Goa Electricity Department under Section 62 (1) (a) and 86 (1) (a) to (e) of The Electricity Act, 2003 arrGSPL Edit (Size: 0.50MB )
Tuesday, January 21, 2014
Petition No. 126/2014 : Petition for approval of the Aggregate Revenue Requirement (ARR) and Tariff Proposal for FY 2014-15 for the Electricity Department of Chandigarh under Section 45, 46, 61 62, 64 and 86 of the Electricity Act, 2003 arrchd14-15 Edit (Size: 1.34MB )
Tuesday, January 21, 2014
Petition No. 125/2014 : PETITION FOR APPROVAL OF AGGREGATE REVENUE REQUIREMENT (ARR), EXPECTED REVENUE FROM CHARGES (ERC), TARIFF PROPOSAL FOR FY 2014-15 OF ELECTRICITY DEPARTMENT, GOVERNMENT OF PUDUCHERRY arrpudu14-15 Edit (Size: 1.05MB )
Monday, January 20, 2014
Petition No. 124/2014 : Petition for approval of Annual Revenue Requirement (ARR) and Tariff proposal for FY 2014-15 for the UT of Andaman & Nicobar Islands under Section 61, 62 and 64 of the Electricity Act, 2003 arrani14-15 Edit (Size: 1.66MB )
Thursday, January 16, 2014
Petition No. 123/2014 : Petition for approval of Annual Revenue Requirement (ARR) and Tariff proposal for FY 2014-15 for the UT of Lakshadweep under Section 61, 62 and 64 of the Electricity Act, 2003v arrlkd14-15 Edit (Size: 0.94MB )
Wednesday, January 15, 2014
Petition No. 122/2014 : Petition for approval of Review for FY 2013-14 and Aggregate Revenue Requirement (ARR) for FY 2014-15 for the Electricity Department of Goa under Section 45, 46, 61 62, 64 and 86 of the Electricity Act, 2003 arrgoajan Edit (Size: 0.93MB )
Monday, January 13, 2014
Petition No. 121/2014 : Petition for approval of Tariff for Puducherry Power Corp. Ltd. Gas Power Station, (32.5MW) for the period 2014-15 arrppcl14-15 Edit (Size: 0.12MB )
Thursday, January 9, 2014
Petition No. 158/ 2014: Petition for approval of Business Plan for the Control Period FY 2015-16 to FY 2017-18 of Electricity Department, Govt of Puducherry BPEDP Edit (Size: 1.47MB )
Wednesday, January 1, 2014
Petition No. 120/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2014-15 ARRDNHFY14-15 Edit (Size: 0.63MB )
revisedarrdnh Edit (Size: 0.69MB )
formatDNHFY14-15 Edit (Size: 0.27MB )
Tuesday, November 26, 2013
Petition No. 119/2013 : Petition filed under Section 86(1)(c) and Section 142 of the Electricity Act, 2003 read with JERC (Open Access in Transmission and Distribution) Regulations, 2009 petitionperfectfila Edit (Size: 0.16MB )
Monday, November 11, 2013
Petition No. 114/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2014-15 arrddnov Edit (Size: 0.89MB )
Friday, November 1, 2013
Petition No. 110/2013 : Petition for seeking determination of Preferential Tariff under Net Metering for Rooftop Solar Photovoltaic Power Projects of CREST and for sale of such power to the Electricity Department of UT Chandigarh under section 61, 62, 86 and 181 of the Electricity Act, 2003 and as per Joint Electricity Regulatory Commission for State of Goa & Union Territories (Procurement of Renewable Energy) Regulations 2010. gepart1 Edit (Size: 3.43MB )
crestpetition Edit (Size: 0.04MB )
DPRHT Edit (Size: 0.29MB )
DPRLT Edit (Size: 0.27MB )
PCM Edit (Size: 0.03MB )
SPV Edit (Size: 0.02MB )
Sunday, September 29, 2013
Petition No. 103/2013 : Petition for grant of Intra-State Trading Licence –Goa under Section 14 of Electricity Act, 2003 gepart1 Edit (Size: 3.43MB )
gepart2 Edit (Size: 3.50MB )
gepart3 Edit (Size: 3.31MB )
gepart4 Edit (Size: 3.40MB )
gepart5 Edit (Size: 3.31MB )
gepart6 Edit (Size: 3.50MB )
gepart7 Edit (Size: 3.42MB )
gepart8 Edit (Size: 3.47MB )
gepart9 Edit (Size: 2.21MB )
corriglobal Edit (Size: 0.13MB )
Monday, May 6, 2013
Petition No. 101/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRLKD Edit (Size: 0.23MB )
AnnexureI Edit (Size: 0.37MB )
FomatsLKD2 Edit (Size: 0.13MB )
Tuesday, April 9, 2013
Petition No. 102/2013 : Review petition under section 94 of the Electricity Act, 2003 resaheliapr Edit (Size: 0.22MB )
Monday, April 8, 2013
Petition No. 100/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRCHDFY2013-14 Edit (Size: 1.19MB )
Friday, February 15, 2013
Petition No. 96/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRPUDUCHERRFY2013-14 Edit (Size: 1.34MB )
Friday, February 8, 2013
Petition No. 99/2013 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRGOAFY2013-14 Edit (Size: 2.84MB )
Tuesday, February 5, 2013
Petition No. 98/2013 : Petition for approval of Tariff for Karaikal Gas Power Station, (32.5MW) for the period 2013-14 ppclfy2013-14 Edit (Size: 0.14MB )
Tuesday, February 5, 2013
Petition No. 93/2013 : Petition for approval of Power Purchase Agreement (PPA) between Electricity Department, Andaman & Nicobar Administration, and NTPC Ltd. 5mwntpc Edit (Size: 0.31MB )
Monday, January 14, 2013
Petition No. 94/2013 : Petition for approval of Power Purchase Agreement between Electricity Department, Andaman & Nicobar Administration and M/s Surya Chakra Green Fuel Ltd under section 86 (1) (b) of Electricity Act, 2003 2MW Edit (Size: 0.32MB )
annx94 Edit (Size: 0.31MB )
DPR Edit (Size: 1.05MB )
Thursday, January 10, 2013
Petition No. 92/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRDNHFY2013-14 Edit (Size: 1.10MB )
Friday, November 30, 2012
Petition No. 90/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRDDFY2013-14 Edit (Size: 0.67MB )
Friday, November 30, 2012
Petition No. 91/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2013-14 ARRANIFY2013-14 Edit (Size: 1.87MB )
Thursday, November 29, 2012
Petition No. 89/2012 : PETITION FOR APPROVAL OF COMPLETED/ACTUAL CAPITAL COST OF THE PROJECT AND TARIFF OF THE PETITIONER – A POWER GENERATING COMPANY - UNDER REGULATIONS 3(2)(a), 3(4), 12, AND 36 OF THE JOINT ELECTRICITY REGULATORY COMMISSION FOR THE STATE OF GOA AND UNION TERRITORIES (TERMS AND CONDITIONS FOR DETERMINATION OF TARIFF) REGULATIONS, 2009 READ WITH SECTIONS 62 (1) (a) AND 63 OF THE ELECTRICITY ACT, 2003 ARRSURYAFY2013-14 Edit (Size: 0.24MB )
Thursday, November 29, 2012
Petition No. 85/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2012-13 arrlkd12-13 Edit (Size: 1.03MB )
Wednesday, August 1, 2012
Petition No.63/2012 : True up Petition on Tariff Order of JERC for FY 2010-11 damantrueup Edit (Size: 0.15MB )
Tuesday, February 14, 2012
Petition No. 70/2012 : Aggregate Revenue Requirement and Tariff petition for FY 2012-13 GOAARRFY2012-13 Edit (Size: 0.63MB )
Wednesday, January 25, 2012
Petition No. 66/2012 : Petition for determination of Project Specific Preferential Tariff for Roof Top Solar Photo Voltaic Project for sale of such power to ED, DNH. PetitionIMPPL Edit (Size: 0.67MB )
Monday, January 9, 2012
Petition No.64/2012 : Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. binder Edit (Size: 2.87MB )
Friday, December 30, 2011
Petition No. 63/2012: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. DDARRFY2012-13 Edit (Size: 0.70MB )
Wednesday, November 30, 2011
Petition No. 62/2012: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. dnharrfy2012-13 Edit (Size: 0.60MB )
Wednesday, November 30, 2011
Petition No. 65/2012: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. aniarrfy2012-13 Edit (Size: 0.59MB )
Monday, November 28, 2011
Petition No. 60/2011: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2012-13. EDPARRFY12-13 Edit (Size: 1.95MB )
Wednesday, November 23, 2011
Petition No. 40/2011: Aggregate Revenue Requirement (ARR) and Tariff Petition for FY 2011-12. petitiongoa1312 Edit (Size: 2.11MB )
Monday, October 24, 2011
Petition No. 39 /2011: Determination of Tariff for 1.0 MW Power from rooftop PV & Small Solar Power Generation (RPSSGP) for supply to the Puducherry Utility by Saheli Exports Pvt. Ltd. sahelipetition1 Edit (Size: 3.67MB )
Tuesday, June 28, 2011
Petition No. 72/2012 : Petition for Power Purchase Agreement for Procurement of 5 MW from new Grid Connected Solar Project on Long Term basis (Under New Project Scheme) between Electricity Department Daman & Diu and M/s Waaree Energies Pvt Ltd. SOLAR2552012 Edit (Size: 0.80MB )
Monday, March 14, 2011
Label
If you are not able to view the document: Click here to Adobe Reader Download
Note:- If the script is disabled, PDF preview function will get affected in some browsers .
Label

Joint Electricity Regulatory Commission
rajat.katiyar@uneecops.com
Goa link Andaman and Nicobar link Chandigarh link Dadar and Nagar Haveli link Daman and Diu link Puducherry link Lakshadweep link